AGENDA
Wastewater Management Review Committee meeting Friday, 18 July 2025 |
|
I hereby give notice that a Wastewater Management Review Committee meeting will be held on: |
|
Date: |
Friday, 18 July 2025 |
Time: |
2:00pm |
Location: |
Tauranga City Council Chambers Level 1 - 90 Devonport Rd Tauranga |
Please note that this meeting will be livestreamed and the recording will be publicly available on Tauranga City Council's website: www.tauranga.govt.nz. |
|
Marty Grenfell Chief Executive |
Terms of reference – Wastewater Management Review Committee
Membership
Chair |
Mr Spencer Webster – Ngā Pōtiki |
Deputy chair |
Cr Rick Curach – Tauranga City Council |
Members |
Cr Rick Curach – Tauranga City Council Cr Kevin Schuler – Tauranga City Council Cr Hēmi Rolleston – Tauranga City Council Cr Rod Taylor – Tauranga City Council Ms Lara Burkhardt – Ngā Pōtiki Mr Spencer Webster – Ngā Pōtiki Mr Whitiora McLeod - Ngāi Te Rangi Mr Des Heke - Ngāti Ranginui Ms Destiny Leaf – Ngāti Ranginui (alternate member) |
Quorum |
Four members with at least one member representing Tauranga City Council and one member representing Ngā Pōtiki |
Decision-making |
By consensus where possible. If consensus cannot be reached, by majority vote. If there is an equal number of votes, the member who is chairing the meeting has a casting vote. |
Meeting frequency |
A minimum of twice yearly |
Meeting venue |
To alternate between marae and council venues; or as appropriate to a meeting agreed by the Chair and the Deputy Chair. |
The Committee has a membership of eight, four of whom are elected members from Tauranga City Council (TCC) and four who are appointed as representatives of iwi, with one member each from Ngāti Ranginui and Te Runanga o Ngāi Te Rangi Iwi Trust and two members representing Ngā Pōtiki ā Tamapahore Trust Board.
The Wastewater Management Review Committee is established as a committee of Council under the Local Government Act 2002 and conditions imposed on Bay of Plenty Regional Council Coastal Permit # 62878.
Role
· To ensure Wastewater operations are in accordance with the Wastewater Management Review Committee Management Plan.
Scope
(i) Decommissioning of the Te Maunga Sludge Pond and the future use of the pond.
(ii) Conversion of the Te Maunga Oxidation Ponds to wetlands.
(g) Assessment of the scope and adequacy of sampling and monitoring.
(h) Notification to appropriate parties of activities that may have adverse effects.
(i) To receive, review and recommend action following receipt of wastewater reports.
(i) Development of alternatives to waterborne wastewater systems;
(ii) Options for further treatments;
(iii) Options for methods of disposal;
(iv) Monitoring effects on the environment.
(i) Decisions as to the allocation of the Environmental Mitigation and Enhancement Fund in accordance with Condition 18.3(b) of Coastal Permit N0 62878 hereof or,
(ii) Recommendations to the Permit Holder in relation to physical environmental mitigation or enhancement or mitigation works in accordance with Condition 18.3(c) of Coastal Permit N0 62878 hereof; -
the Review Committee will exercise its best endeavours to ascertain the existence of any persons or bodies who may have a particular interest or stake in the ecological health of the Tauranga Harbour (particularly the Upper Harbour/Rangataua Bay area) and to consult with those bodies or persons as to appropriate initiatives and measures to be so recommended (in accordance with Condition 18.3(b)of Coastal Permit N0 62878) or undertaken (in accordance with Condition 18.3(c)of Coastal Permit N0 62878). As a minimum, the Review Committee shall consult with:
· Nga Potiki Kaitiaki Resource Management Unit hapu and iwi of Te Runanga o Ngaiterangi Iwi Trust, Ngati Ranginui and Ngati Pukenga and Te Arawa and their respective hapu which hold kaitiaki status over the wider Tauranga Moana district, including any Working Group established by those hapu or iwi;
(a) A copy of this report shall also be provided to the Chief Executive, Tauranga City Council.
(t) Confirmation of Committee minutes.
Reporting
The Wastewater Management Review Committee reports to Council and the Chief Executive of the Bay of Plenty Regional Council.
Chair and Deputy Chair acting as Co-Chairs
The Chair and Deputy Chair of the Wastewater Management Review Committee (WWMRC) have a governance role to ensure that the WWMRC meets regularly and undertakes its role to monitor and provide advice to Tauranga City Council as the consent holder of Bay of Plenty Regional Council Coastal Permit # 62878 and ensure wastewater operations are in accordance with the Wastewater Management Plan.
· The Deputy Chair will be appointed by the Wastewater Management Review Committee.
· While these roles are separately appointed it is the intention that they act as co-chairs.
○ Only one person can chair a meeting at any one time. The person chairing the meeting has the powers of the chair as set out in standing orders and has the option to use the casting vote in the case of an equality of votes.
○ The rotation of the meeting chairs is at the discretion of the Chair and Deputy Chair and subject to their availability, however it is expected that they will alternate chairing meetings when possible.
○ When the Deputy Chair is chairing the meeting, the Chair will vacate the chair and enable the Deputy Chair to chair the meeting. The Chair will be able stay and participate in the meeting unless they declare a conflict of interest in an item, in which case they will not participate or vote on that item.
○ The Chair and Deputy Chair will attend pre-agenda briefings and split any other duties outside of meetings, e.g. spokesperson for WWMRC.
○ The Chair and Deputy Chair will jointly oversee and co-ordinate all activities of the WWMRC within their specific terms of reference and delegated authority, providing guidance and direction to all members and liaising with Council staff in setting the content and priorities of meeting agendas.
○ The Chair and Deputy Chair will be accountable for ensuring that any recommendations from the WWMRC are considered by the Tauranga City Council.
Refer to the position description for the Chair and Deputy Chair for more details.
18 July 2025 |
Order of Business
5 Confidential business to be transferred into the open
7 Declaration of conflicts of interest
8.1 Monitoring Upgrade and Technological Review - WWMRC Endorsement
18 July 2025 |
8 Business
8.1 Monitoring Upgrade and Technological Review - WWMRC Endorsement
File Number: A18519070
Author: Jim Summers, Environmental Programme Leader
Authoriser: Nic Johansson, General Manager: Infrastructure
Purpose of the Report
1. To seek endorsement of the Monitoring Upgrade and Technological Review (MUTR) 2024 draft report, following the workshop on 18 July 2025.
That the Wastewater Management Review Committee: (a) Receives the report titled “Monitoring Upgrade and Technological Review – WWMRC Endorsement and the attached MUTR. (b) Endorses the MUTR 2024 draft report. |
background
2. Tauranga City Council (TCC) engaged Beca Ltd and Boffa Miskell in April 2024 to prepare the 2019–2024 MUTR. As required by Condition 20.2, the report must be developed in consultation with iwi groups identified by the Wastewater Management Review Committee (WWMRC).
3. In response to feedback from tangata whenua representatives on the WWMRC, a collaborative approach was adopted in place of a separate cultural report. Mārearea was engaged in February 2025 to support this process and has worked closely with Beca to develop the draft MUTR report.
4. The draft report was shared with tangata whenua representatives and TCC staff on 7 July 2025. It will be presented for discussion with the WWMRC at the workshop on 18 July 2025.
5. WWMRC members are not expected to have read the full draft ahead of the workshop, as the intent is to work through the key sections together during the session and confirm collective support for the report.
6. Endorsement from the WWMRC is required to meet the requirement for consultation and to ensure the final report can be submitted to the Bay of Plenty Regional Council (BOPRC) as soon as practical.
1. DRAFT
MUTR Report 2024 - A18519058 ⇩
18 July 2025 |
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 1
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 2
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 3
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 4
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 5
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 6
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 7
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 8
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 9
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 10
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 11
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 12
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 13
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 14
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 15
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 16
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 17
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 18
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 19
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 20
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 21
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 22
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 23
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 24
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 25
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 26
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 27
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 28
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 29
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 30
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 31
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 32
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 33
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 34
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 35
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 36
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 37
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 38
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 39
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 40
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 41
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 42
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 43
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 44
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 45
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 46
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 47
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 48
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 49
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 50
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 51
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 52
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 53
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 54
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 55
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 56
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 57
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 58
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 59
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 60
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 61
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 62
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 63
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 64
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 65
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 66
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 67
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 68
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 69
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 70
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 71
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 72
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 73
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 74
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 75
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 76
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 77
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 78
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 79
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 80
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 81
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 82
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 83
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 84
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 85
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 86
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 87
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 88
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 89
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 90
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 91
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 92
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 93
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 94
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 95
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 96
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 97
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 98
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 99
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 100
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 101
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 102
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 103
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 104
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 105
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 106
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 107
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 108
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 109
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 110
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 111
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 112
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 113
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 114
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 115
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 116
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 117
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 118
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 119
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 120
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 121
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 122
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 123
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 124
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 125
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 126
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 127
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 128
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 129
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 130
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 131
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 132
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 133
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 134
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 135
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 136
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 137
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 138
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 139
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 140
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 141
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 142
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 143
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 144
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 145
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 146
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 147
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 148
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 149
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 150
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 151
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 152
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 153
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 154
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 155
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 156
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 157
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 158
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 159
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 160
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 161
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 162
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 163
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 164
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 165
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 166
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 167
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 168
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 169
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 170
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 171
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 172
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 173
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 174
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 175
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 176
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 177
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 178
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 179
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 180
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 181
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 182
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 183
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 184
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 185
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 186
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 187
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 188
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 189
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 190
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 191
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 192
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 193
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 194
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 195
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 196
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 197
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 198
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 199
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 200
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 201
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 202
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 203
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 204
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 205
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 206
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 207
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 208
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 209
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 210
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 211
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 212
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 213
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 214
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 215
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 216
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 217
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 218
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 219
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 220
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 221
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 222
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 223
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 224
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 225
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 226
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 227
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 228
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 229
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 230
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 231
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 232
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 233
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 234
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 235
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 236
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 237
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 238
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 239
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 240
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 241
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 242
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 243
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 244
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 245
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 246
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 247
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 248
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 249
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 250
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 251
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 252
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 253
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 254
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 255
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 256
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 257
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 258
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 259
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 260
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 261
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 262
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 263
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 264
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 265
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 266
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 267
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 268
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 269
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 270
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 271
This page is a placeholder for a single page of a PDF attachment. It will be replaced by the actual PDF page when the PDF version of this document is generated.
Report: Monitoring Upgrade and Technological Review - WWMRC Endorsement
Attachment: DRAFT MUTR Report 2024
Page: 272
18 July 2025 |
9 Discussion of late items